Carolyn and I arrived at the SpaceFarm around 12:00pm. The day was overcast, slightly windy, and the temperature was in the mid 30’s. We worked Saturday and Sunday and spent the night with my aunt and uncle. It was a cold and labor intense visit; we focused on cleaning and prepping the unit for remodel.
List of progress
• Inspected propane lines and plumbing
• Swept up mouse droppings and rat poison
• Scrubbed mold out of refrigerator
• Sanitized microwave, sinks, counters, and toilet
• Tore our bathroom wall and wardrobe out
• Removed and cleaned furnace ducts
• Removed bathroom sink
• Remove kitchen counter, sink, and stove
Tools and Supplies
• Cordless driver drill
• Philips/flathead bit
• 11/64 metal drill bit (to drill out rivets in walls and wardrobe)
• Hand philips screwdriver
• Hand flathead screwdriver
• Hammer
• Five-in-one
• Utility knife
• W-D 40
• Contractor quality trash bags
• Mop and bucket
• Bleach
• Tool box
• Keys
• Broom
• Dustpan