This was a short trip filled with drinking and eating.
We lifted the trailer onto the wood blocks and took the weight off of the tires. Installed the drainage plumbing for the shower. Prepped/measured the belly pan for replacement.We started off by jacking up the back end of the trailer to allow for easier access when installing the new belly pan (which we were still waiting on).

We only had one small car jack so we needed to do some skillful rigging.
(the bowed support that the jack is pressing against is three pieces of angle iron
resting against the two parallel side beams of the trailer).

It worked and no one died surprisingly.
Inside the trailer we needed to prepare the location of the shower by installing
the wast water ABS piping.
The waste water ABS shower drain piping was retrofitted to the already existing
gray water ABS ventilation pipe which went straight up through the ceiling.
mmm. beer.