Sunday, June 14, 2009

June 13-14, 2009

To Do:
Install the majority of the floor insulation
Start roughing in PEX plumbing
Continue sealing cracks in underbelly
Clean off gunk from the one removed vista view window frame
Install front three exterior yellow lights



Ruth, Jackson’s mommy, came out and helped this time. We installed lots more insulation. It is all done in the floor except for two more sections. Ruth scraped the caulk off of the window frame and shined it up so it looks brand new. She also installed the new lights on the outside front of the trailer below our caravan number. Jackson riveted the belly pan so it was held up more. We fitted the cardboard cutout shower stall into the bathtub, made adjustments, and sent it back home with Ruth. Neal is making it out of aluminum for us. It will be three enclosing walls that will be welded together so it will fit right over the tub in one piece. We also started fitting the PEX plumbing together for the shower, sink, and washer/dryer.

We replaced these lights

Before...

and After!

The insulation in the very end of the trailer.

We made a pathway for the PEX (plumbing) to the shower.
Our shower set up is almost complete once we get the stall for it.
Insulation around the gray water tank.
Ruth working on the vista view window frame.
Lots of yucky stuff on there.

No comments:

Post a Comment