Monday, July 20, 2009

Sunday, July 19th - Monday, July 20th

Sunday, July 19th - Monday, July 20th

To Do:
Test light hookups
Route 12 volt electrical to back of trailer
Replace 600 volt wire to main breakers
Install control panel
Move airstream to Missoula!


Things we need:

600 volt power cable 2ft
8 volt braided wires and casing (see list)
Pigtail hookups


We routed the 12 volt wires from where the old converter/charger
was to its new location in the back under the bed.
I found a lot of the the right gauge wire we needed at
Pacific Steel Recycling.

12 volt wires are hooked up and 12volt lights and outlets
seem to be working fine!

Installing new control panel. It is a fifth the size!

We stripped some more vinyl off the walls in the back of the stream. This process is taking quite a while to do, but it is really worth it.



We moved the airstream to its new location between
Milltown and East Missoula. This will be where we will
live and complete the trailer.
Jard, our land manager, helping Dave back the trailer into its spot.
Home, sweet home.

No comments:

Post a Comment